📍 2nd Floor, Plaza No. 14I, Service Road, Rafi Commercial, Bahria Town Phase 8, Rawalpindi
📞 (+92) 333 8543004 📞 (+92) 331 0000424

Solid Grey Structure

The crucial groundwork: premium brick masonry, reinforced concrete columns, roof slabs, and basic cement plastering.

Grey Structure

Excellence in Grey Structure

The "Grey Structure" is the defining phase of any construction project in Pakistan. It involves laying the solid foundation, raising the raw red brick walls, casting the grey cement columns, and pouring the concrete roof slabs.

We never compromise on the grey structure. Using only premium grade steel, top-tier cement, and precisely cured concrete, we build a raw structure that is practically indestructible, perfectly plumb, and ready for luxury finishing.

  • ✓ A-Grade Red Brick Masonry
  • ✓ Reinforced Concrete Columns & Slabs
  • ✓ Underground Plumbing & Electrical Piping
  • ✓ Internal & External Cement Plastering
Request a Quote →
The Aamir Builders Difference

Why Choose Us for Grey Structure?

✦

Premium Quality Standards

We source only the finest materials, ensuring every inch of your project meets international luxury standards and outlasts generations.

◆

Transparent Execution

No hidden costs, no delays. We provide full transparency on structural designs, material costing, and strict construction timelines.

✧

DHA & Bahria Expertise

With deep expertise in Islamabad's premium sectors, we navigate complex bylaws smoothly to ensure 100% NOC clearances.

How It Works

Our Process

01

Foundation & Excavation

Excavation and foundation work per the approved structural drawing.

02

Columns & Beams

RCC columns and beams cast to the engineered structural grid.

03

Slab Casting

Floor slabs cast per floor, inspected before proceeding to the next level.

04

Brickwork

Brickwork completed to a plaster-ready grey structure state.

Meeting Bahria Town & DHA's Structural Inspection

Several Bahria Town and DHA plot categories require the grey structure stage to pass the society's own structural inspection before further construction is permitted. We build to the approved structural grade so this inspection isn't a bottleneck later.

Grey Structure Cost Factors

Per-sq-ft grey structure rates depend on structure type (RCC frame vs. load-bearing) and material grade. Get in touch for a rate estimate for your plot.

Frequently Asked Questions

RCC frame or load-bearing, which do you use?

We recommend RCC frame or load-bearing construction based on your plot size, soil conditions and structural requirements.

What exactly is included in a grey structure package?

Foundation, columns, beams, slabs and brickwork through to a plaster-ready state. Finishing works are a separate service.

What material brands do you use for grey structure?

We use quality-graded cement and steel brands, confirmed with you before construction begins.

How is the grey structure inspected before we proceed?

Our site supervision team inspects each phase before the next begins, and coordinates with the relevant society's inspection where required.

How long does grey structure typically take?

Timeline depends on plot size and structure type. We provide a project-specific schedule after the design stage.

Call: +92 333 8543004 WhatsApp Us
Website by Digital Diva